Galley kitchen update

Before:



After:

This one is a pretty good example of how one can phase through a renovation in a way that minimizes operational downtime. Each of these phases was implemented in 1-3 days without ever an overnight where the kitchen wasn’t functional. I try to time-box my work, such that scope is defined by the window of time — not the other way around. I can get yelled at by the doorman if I walk through the lobby with my tools after 5pm, and unless it’s an unoccupied job-site, I don’t leave unfinished messes overnight.

Read More →

Kitchen Remodel

Before:

After:

Notable tasks: Using appliance paint to make a black refrigerator white, and being pleasantly surprised at the results. Opted for roll-on instead of spray based on online-reviews. Converting an unused bathroom vanity by swapping the sink out for a piece of butcher-block. Updating some 70’s style cabinet doors by filling in the routed groove and painting over (as opposed to cabinet replacement…I like to up-cycle where possible). Floor is laminate strips printed to look like wood.

Proudly powered by WordPress | Theme: Baskerville 2 by Anders Noren.

Up ↑