Herringbone tile foyer

Before:

The trickiest part of this one was figuring out the border. Not only were there were 5 doorways, 2 stairwells and an elevator to accommodate, but the location was an odd shape with wide and narrow sections. Herringbone looks weird when it’s in too narrow a space, so after much photoshop, laying out of tiles in different patterns, and sending some snapshots to a friend, I settled on a double border.

Read More →

Roofdeck refinish

Before:

After:

The fun part here was coming up with a nimble enclosure to satisfy the OSHA requirement that any exterior work which generates dust be encapsulated from one’s hapless neighbors.

Read More →

Window replacement

Nothing special, just a random story illustrating why this business is really nuts sometimes.

This window couldn’t be cleaned because something had gone wrong with the seal and the debris was IN-BETWEEN the panes of glass. So I ordered a new window.

The guy I hired to do the replacement ripped out the old window and threw it into the backyard. He spent 4 hours trying to get the new window in before throwing in the towel. The old window was in pieces in the yard, and unusable (How I wish I’d gotten a photo!). I wasn’t in town so I called in another contractor I knew to see if he could manage it. He said the window I ordered was for new construction and couldn’t be used as a replacement. I asked him if it could be modified to work and he said he didn’t think so, but he had a buddy who had some surplus windows, a few inches too short, but he could go pick one up and install it. The first guy could do the framing to close up the gap since it was too short for the opening. I said ok.

WTF.

Read More →

Radiator cover support system

This was more of a repair, but the twist took quite a lot of thought. I didn’t want to rip the whole thing apart and rebuild, but the challenge was to not only fix the alignment and attachment of this incredibly heavy cover (3/4″ ply + 3/4″ cabinet doors + baseboard molding!), but ensure that access for anyone who needed to perform future maintenance on the radiator would be easy and safe.

The tricky part was anticipating the correct tilt that would keep the panel balanced on swivel casters, within the limits of the space behind it (which had pipes and electrical), while being easy to snap into place again.

Bathroom refresh

After:

Before:

The most interesting part of this one was the vanity. Based on the square pegs and nails, the thing was easily 100 years old. Stripping off 4 layers of paint revealed a reddish wood that I’m guessing is fir. I built in the shelf and the lip around the top out of poplar, which necessitated a bit of work with stain and polyurethane to get the colors to match.

Read More →

Water damage repair on a 1920’s style paneled apartment

Mostly minor stuff on this Park Avenue apartment, but the water damage and slap-n-dash repair jobs over years meant a lot of gaps and flaking and mismatching elements that needed to be patiently coaxed back into order, one bit at a time around the entire perimeter of the room. To add to the fun, things had gotten done out of order (why do so many people want to START with flooring??), which meant carefully sneaking around and behind elements to repair things you wish they had scheduled first.

Before:

After:


Before:

After:

Bathroom sink and vanity with laundry

How do you fit a washer-dryer into a tiny Manhattan bathroom? Once piece at a time.

I poured a custom concrete trough sink with the drain in the back corner so as to open up the room for the washer-dryer to fit underneath. Which then necessitated a custom cabinet to match underneath.

Removing the plywood mold. Concrete mix was white Portland cement with white sand. The trickiest part was cutting things on the angle so the sink would drain properly, and then getting all those subtle angles to line up smoothly.

Patching, sanding, sealing.

Now for the cabinet…

Read More →

Bathroom renovation with large format stone tile

Before:

After:

Years of IT got me used to cleaning up other people’s disasters, and this was yet another project that got me shaking my head and wondering “what were they thinking?” Demolition had been carried out throughout the unit by someone working without drawings, a plan, or timeline before I took over. Luckily there were bathrooms on other floors to use while we worked, but I wondered, why start by demolishing a functioning bathroom? Whether you’re working by yourself around the clock on-site or with a team in shifts, it’s the first necessity, for peeing, washing tools, or showering off a day’s worth of fiberglass insulation. This is a big reason I work in chunked phases, even within a single room — the wheels of production grind faster overall when one isolates and minimizes the functional downtime of each room and fixture.

Engineered stone tile on floor and walls, pine ceiling, replaced ventilation fan, sink/vanity, bath fixtures.

Kitchen Remodel

Before:

After:

Notable tasks: Using appliance paint to make a black refrigerator white, and being pleasantly surprised at the results. Opted for roll-on instead of spray based on online-reviews. Converting an unused bathroom vanity by swapping the sink out for a piece of butcher-block. Updating some 70’s style cabinet doors by filling in the routed groove and painting over (as opposed to cabinet replacement…I like to up-cycle where possible). Floor is laminate strips printed to look like wood.

Proudly powered by WordPress | Theme: Baskerville 2 by Anders Noren.

Up ↑