Bathroom refresh

After:

Before:

The most interesting part of this one was the vanity. Based on the square pegs and nails, the thing was easily 100 years old. Stripping off 4 layers of paint revealed a reddish wood that I’m guessing is fir. I built in the shelf and the lip around the top out of poplar, which necessitated a bit of work with stain and polyurethane to get the colors to match.

Read More →

Water damage repair on a 1920’s style paneled apartment

Mostly minor stuff on this Park Avenue apartment, but the water damage and slap-n-dash repair jobs over years meant a lot of gaps and flaking and mismatching elements that needed to be patiently coaxed back into order, one bit at a time around the entire perimeter of the room. To add to the fun, things had gotten done out of order (why do so many people want to START with flooring??), which meant carefully sneaking around and behind elements to repair things you wish they had scheduled first.

Before:

After:


Before:

After:

Bathroom sink and vanity with laundry

How do you fit a washer-dryer into a tiny Manhattan bathroom? Once piece at a time.

I poured a custom concrete trough sink with the drain in the back corner so as to open up the room for the washer-dryer to fit underneath. Which then necessitated a custom cabinet to match underneath.

Removing the plywood mold. Concrete mix was white Portland cement with white sand. The trickiest part was cutting things on the angle so the sink would drain properly, and then getting all those subtle angles to line up smoothly.

Patching, sanding, sealing.

Now for the cabinet…

Read More →

Bathroom renovation with large format stone tile

Before:

After:

Years of IT got me used to cleaning up other people’s disasters, and this was yet another project that got me shaking my head and wondering “what were they thinking?” Demolition had been carried out throughout the unit by someone working without drawings, a plan, or timeline before I took over. Luckily there were bathrooms on other floors to use while we worked, but I wondered, why start by demolishing a functioning bathroom? Whether you’re working by yourself around the clock on-site or with a team in shifts, it’s the first necessity, for peeing, washing tools, or showering off a day’s worth of fiberglass insulation. This is a big reason I work in chunked phases, even within a single room — the wheels of production grind faster overall when one isolates and minimizes the functional downtime of each room and fixture.

Engineered stone tile on floor and walls, pine ceiling, replaced ventilation fan, sink/vanity, bath fixtures.

Kitchen Remodel

Before:

After:

Notable tasks: Using appliance paint to make a black refrigerator white, and being pleasantly surprised at the results. Opted for roll-on instead of spray based on online-reviews. Converting an unused bathroom vanity by swapping the sink out for a piece of butcher-block. Updating some 70’s style cabinet doors by filling in the routed groove and painting over (as opposed to cabinet replacement…I like to up-cycle where possible). Floor is laminate strips printed to look like wood.

Classroom Cubbies


It was only a passing request from my daughter’s first grade teacher – whether I had any ideas for improving the book storage above the coat cubbies, which was admittedly an eyesore. Upon some examination of the alcove, I told him he should rethink the entire situation, and via my own pushy compulsion, somehow volunteered to rectify the situation. What I peeled away during demolition was an unused legacy cubby system of hooks mounted on a long shelf, which sat unused behind the existing milk crates housing the kids’ stuff. The milk crates rested on top of a couple of unused shelves fashioned out of the doors that once rendered the alcove a large closet. Above all of this nonsense was a shelf, also made of the doors, housing a few hundred pounds of hidden books (yes, above where the kids retrieved their coats), covered with a few pieces of 1/2″ plywood, held vertically in place by small bolted slats that he would turn to remove the wood in order to get access.

Some remnants of what I ripped out:

milk crate cubbies alcove with shelf Read More →

Adult Trike Kiddie Cab

And now for something completely different…

The idea for this emerged from the repeated dilemma of needing to transport two kids, which the trail-a-bike simply can’t accommodate. I started looking at cargo bikes, or “bakfietsen” which I had seen all over Amsterdam, but found the cost prohibitive. Trikes on the other hand, are roughly the same price as two-wheelers. I found what I was after on Craig’s list, gave the bike some TLC, built a custom bench out of some pine support slats I rescued from a bed being thrown out, et voilĂ :

Adult tricycle white with wooden kid bench

What I started with: Adult Tricycle with Electric Motor Yellow

Read More →

garden bench restoration

Replaced rotten boards with weather-treated 2×4’s dadoed with a circular saw to fit and lightly stained. I expect this to last decades longer than the thin polyurethaned slats that typically come with these models. Couldn’t find brass bolts in the right size, so I ended up spray painting some carriage bolts gold.

Before:

After:

Corner Cabinet

Body & shelves made from 1/2 plywood to save on cost and weight. Edges concealed with iron-on veneer. Doors and facing made of solid pine. Chinese cabinet hardware purchased ebay.


Initial sketches, which my toddler decided to comment on

Read More →

Vestibule Cubbies

I used slot joints to create this one, but in retrospect, I think dado joints would have been a better choice. Slot joints are great for flexible materials, or in a perfect world where all the pine you get from the lumberyard is flawlessly straight and uniform, but well, yeah.

Proudly powered by WordPress | Theme: Baskerville 2 by Anders Noren.

Up ↑